New catering area at Camille Guerin College

New catering area at Camille Guerin College

The renovation of the catering area at the Camille Guérin College in Saint-Méen-le-Grand has been completed. A one-year work was required to expand the college’s kitchens and catering area at a total cost of €2.2 million, including €1.848 million funded by the Ille-et-Vilaine division.

A dining area more suitable for 430 middle school students

The work made it possible to expand and reorganize the spaces of the half-board: kitchen, preserves, vegetable room, self-catering, dining room, etc. The dining room now has 4 places to accommodate students with special needs. The ground floor of the building in which the boarding school is located has been restructured with the creation of a foyer and classroom. Work began in October 2020 and was completed in early 2022.

  • labor cost : 2.2 million euros
  • Finance : 1.848 million euros from the Ministry of Ile-e-Villain and 352 thousand euros from the state

The Ille-et-Vilaine department invests in colleges

Preparing for the future of young people and contributing to their academic and personal success is a priority of the department responsible for building, renovating and maintaining public colleges through a multi-year investment program. In 2022, a budget of 37.35 million euros was allocated for these investments. The work of the Camille Guérin High School in Saint-Méen-le-Grand is part of this ambitious plan to restructure, renovate and build the secondary schools of Ille-et-Vilaine, in order to allow the reception and school comfort for all students of the College.

Visualize on the map the construction sites of the faculties of the department

View in screen size

READ  Argenteuil: A tobacco-free space created in the garden of the Town Hall

Leave a Reply

Your email address will not be published. Required fields are marked *